First, the 3.2 beta seems to be working well. Thanks for this update
Second, would it be possible to add an optional delay (time) parameter to each of the IAS critique speeds in the cfg? I'm finding that ActiveSky with various gusts and turbulance settings, can easily trip the IAS penalty, below 10,000ft. I currently have the lower IAS penalty speed set to higher value (260kts), which kind of solves the problem, but I think a self-imposed 30 second delay on a 250knt speed for the lower penalty value would yield much more realistc results. Maybe we could have seperate delay values (in seconds) associated with each of the IAS penalty triggers?
Thanks again and regards,
AL




